A new two-lane boat launching ramp was constructed with a central floating jetty located 150 metres north of the current facility at the Beadon Creek (Onslow) Maritime Facility.
Works also include initial dredging to create deeper waters for safe navigation to and from the ramp, earthworks to form the ramp, and construction of several rock revetment walls.
Four trainees were engaged on the Onslow Boating Precinct project.