boddington gold mine water storage dam

CLIENT:
Newmont

LOCATION:
Boddington, WA

YEAR OF CONSTRUCTION:
2020 – 2021

PROJECT VALUE:
$22M

D6 Water Storage Dam
project overview

The Boddington Gold mine is 120kms from Perth and is one of Australia’s largest producing gold mines.

Ertech was awarded the contract for the construction of a D6 Water Storage Dam project at the site.

projects

D6 Water Storage Dam
Construction of the D6 Water Storage Dam with a minimum of 6GL storage capacity including:

  • Construct D6 Dam including embankment, inlet channel, seepage sump and spillway;
  • Install D6 Dam including embankment liner, outlet pipework (including concrete pipe supports and pipe surround), inlet channel geofabric, seepage drainage (including finger and collector drains), seepage sump (including outlet pipework and liner), spillway liner and instrument works;
  • Construct Junglen Gully Diversion (including embankment);
  • Install Junglen Gully Diversion (including pipework and storage tank/dam).