Environment
Environment
Taylors Regulator Fishway
Ertech was engaged to construct a new fishway as part of a broader Native Fish Recovery Plan to remove barriers to fish passage and connect 400km of stream and wetlands to 530km of Murray River.
Read moreEnvironment
Newman Liquid Waste Facility
Ertech was engaged by the Shire of East Pilbara to increase the treatment capacity of the Newman Liquid Waste Facility and install a solar power supply.
Read moreEnvironment
Catfish Billabong Environmental Structure
The new environmental structure in the inlet channel manages the flow between the Billabong and the Murray River, ensuring native species receive a more natural cycle of wetting and drying phases.
Read moreEnvironment
South Capel Remediation Project
Ertech was contracted to remove and relocate material from a decommissioned dam at the Capel dry plant to a purpose built, capped facility.
Read moreEnvironment
Cosgrove 3 Landfill
Ertech undertook all site preparation, clearing and earthworks for the facility to allow for the transition into a modern landfill site.
Read moreEnvironment
Perth Stadium Pre-construction Site Works
The Ertech Keller JV was formed to design and prepare key areas of the site in advance for the construction of the stadium. Works were completed in 2014.
Read more