Perth Airport Forecourt Plaza

Project Overview

Perth underwent a $1B redevelopment program which includes the construction of an architecturally designed and landscaped Terminal 1 forecourt plaza. Ertech’s works focused on the Terminal 1 plaza, with the end product providing a more pleasant environment for passengers. Other benefits include creating improved pedestrian access and pick up/drop off areas, covered walkways and seating. The project was delivered across three separable stages with the first stage having commenced in April 2015.

Fast Facts

  • ClientPerth Airport Pty Ltd.
  • LocationPerth, WA
  • Year of completion2016

Scope of works

Separable Portion 1:

  • Demolition and disposal of existing pavement and selected above ground infrastructure
  • Removing and relocating selected airport infrastructure located within the project work
  • Minor earthworks to build up selected areas to design level
  • Temporary construction requirements including pedestrian trafficable footpath and safe bus dwelling
  • Installing T2 canopies linking to T2 bus station
  • Installing pay stations, smart lockers, all services, lighting, CCTV, hard and soft landscaping, final finishes and planting
  • Installing all required services throughout the forecourt to enable Separable Portion 1 and the temporary bus station to be commissioned
  • Installing all required below ground services to service the future façade retail, SP2 and SP3

Separable Portion 2:

  • Demolition and disposal of existing pavement and selected above ground infrastructure
  • Removing and relocating selected airport infrastructure located within the project works
  • Minor earthworks to build up selected areas to design level
  • Continued installation of all services to enable full commissioning of all assets, hard and soft landscaping to area east of C Services and facilities to enable PAPL operations to relocate eastern bank of smart trolleys
  • Completion of Small Charter Vehicle (SCV) car park

Separable Portion 3:

  • Demolition and disposal of existing pavement and selected above ground infrastructure
  • Removing and relocating selected airport infrastructure located within the project works
  • Minor earthworks to build up selected areas to design level
  • Completing permanent bus station and ‘town square’ with all assets fully commissioned
  • Hard and soft landscaping from kerb edge to new terminal façade including final finishes and painting
  • All designed assets across entire forecourt commissioned except for retail fit out