CLIENT:
Chevron Australia
LOCATION:
Barrow Island, WA
YEAR OF CONSTRUCTION:
2012
PROJECT VALUE:
Unable to disclose

project overview
Ertech was engaged by Chevron to upgrade the existing runway on Barrow Island for Chevron’s Gorgon Project to meet CASA Standards.
scope of works
The scope of works for the airside infrastructure included:
- Mobilise a 160TPH mobile asphalt plant which included paving, spraying, profiling and haulage equipment;
- Production and placement 28 000T of asphalt;
- Excavation and construction 2 No 20m x 20m concrete aprons;
- Upgrade drainage works to the Apron Area.