Transport
Transport
Smithfield Road Upgrade
Ertech was contracted to upgrade 5KM of Smithfield Road. The works will improve traffic flow by widening Smithfield Road to two lanes of traffic in each direction.
Read moreTransport
Landsborough Highway Pavement Widening and Strengthening
Ertech was contracted to perform pavement widening and strengthening to a 25km section of the Landsborough Highway between Longreach and Winton.
Read moreTransport
West Moreton Line Timber Bridge Replacements
Ertech undertook the design and construction of 18 replacement bridges along the West Moreton Line. The works were performed under a live environment.
Read moreTransport
Gocup Road
Ertech was contracted to upgrade a 5.4km section of Gocup Road by constructing two overtaking lanes and widening and realigning the roads.
Read moreTransport
Progress Road Upgrade
Ertech upgraded Progress Road to a five-lane carriageway, accommodating the 15,000+ vehicles that drive along per day.
Read moreSpearwood Avenue Duplication
Ertech was contracted to complete the Spearwood Avenue Duplication and improvement. The project was delivered in two separable portions.
Read moreTransport
Busselton Margaret River Airport Upgrade
Ertech designed and constructed air and landside civil and services infrastructure at the Busselton Margaret River Airport in WA. The project was recognised with a National Award for Local Government.
Read moreTransport
Blue Mile Tramway Seawall
Ertech undertook the installation of the new Tramway Seawall and replaced the shared footpath connecting North Beach and Belmore Basin in 2018.
Read moreTransport
Perth Airport Forecourt Plaza
Ertech was contracted to construct the Forecourt Plaza under three separable stages. The end product provided a more pleasant environment for passengers.
Read more