Transport

Transport

Smithfield Road Upgrade

Ertech was contracted to upgrade 5KM of Smithfield Road. The works will improve traffic flow by widening Smithfield Road to two lanes of traffic in each direction.
Read more
Transport

Landsborough Highway Pavement Widening and Strengthening

Ertech was contracted to perform pavement widening and strengthening to a 25km section of the Landsborough Highway between Longreach and Winton.
Read more
Transport

West Moreton Line Timber Bridge Replacements

Ertech undertook the design and construction of 18 replacement bridges along the West Moreton Line. The works were performed under a live environment.
Read more
Transport

Gocup Road

Ertech was contracted to upgrade a 5.4km section of Gocup Road by constructing two overtaking lanes and widening and realigning the roads.
Read more
Transport

Progress Road Upgrade

Ertech upgraded Progress Road to a five-lane carriageway, accommodating the 15,000+ vehicles that drive along per day.
Read more
Transport

Spearwood Avenue Duplication

Ertech was contracted to complete the Spearwood Avenue Duplication and improvement. The project was delivered in two separable portions.
Read more
Transport

Busselton Margaret River Airport Upgrade

Ertech designed and constructed air and landside civil and services infrastructure at the Busselton Margaret River Airport in WA. The project was recognised with a National Award for Local Government.
Read more
Transport

Blue Mile Tramway Seawall

Ertech undertook the installation of the new Tramway Seawall and replaced the shared footpath connecting North Beach and Belmore Basin in 2018.
Read more
Transport

Perth Airport Forecourt Plaza

Ertech was contracted to construct the Forecourt Plaza under three separable stages. The end product provided a more pleasant environment for passengers.
Read more