Marine & Coastal

1 2 3 4
  • Ichthys GEP Project Landfall Crossing

    Boskalis Australia

    The contract was for works associated with the construction of the 889km gas export pipeline from the Ichthys field in the browse basin to Darwin.
  • Temporary Construction Load Out Facility

    Roy Hill Infrastructure

    The 55 million tonne per annum Roy Hill project is the next iron ore mining, rail and port project to be developed in the Pilbara region of Western Australia.
  • Utah Point Expansion Project

    Atlas Iron

    The Utah Point Expansion Project at Port Hedland was required to expand shipments of iron ore from 5.6mtpa to 15mtpa through the Utah point stockyards.
  • FMG Team 45 Project

    Team 45

    Ertech was engaged to install 12,890m3 of structural concrete at the Anderson Point Port Facilities.
1 2 3 4